Shifts

Shifts

A shift is one working day saved for reuse: its activity, start and end, break, flexible start, overtime window, and the thresholds that decide how much of a short day is charged. Use this article to add a new shift or working time, and to understand what every field on the shift form does to attendance and pay. You pick shifts when you build event templates, standard schedules and calendar days.

Where: Attendance › Settings › Schedules › Shifts

You need: the Attendance Settings right

Which one, when

You want toUse
Save one day's times and rulesA shift, here
Say what the time is and how it paysAn activity
Build a week from shifts and rest daysAn event template
Give someone a repeating weekA standard schedule
Add a one-off dayThe team calendar

The shift says when. The activity says what the time is and what it pays. Looking for a pay setting on a shift, or a timing setting on an activity, causes most confusion in Attendance settings.

How to add a shift

  1. Go to Attendance › Settings › Schedules › Shifts and select Add new shift.
  2. Enter a Name. It must be unique. Description is optional.
  3. Choose the Activity and Branch, and the Cost Centre and Holiday Type if they apply.
  4. Enter the Start Time and End Time, and the Break-in and Break-out if there is a break. For a whole-day event such as a rest day, tick Is full day instead.
  5. Set the options you need: Core start first and Core start last, Absence Threshold, Half Day Threshold and Overtime window.
  6. To offer it only to some employees, fill in Access Group, Access Department or Access Position.
  7. Select Submit. The shift appears in the list on the left, with a one-line summary such as "8h working, with a 1h break".

How to change or delete a shift

  1. Select the shift in the list. Use Search shifts, or Filters by Activity, Branch, Cost Centre or Group, to find it.
  2. Select Edit, change it and select Update. Or select Delete and confirm.

Changes only affect days scheduled after the change. Days already on the calendar keep the settings they were scheduled with.

Every field on the shift form

FieldWhat it does
NameHow you find the shift. The Bulk Schedule import matches shifts by this name.
DescriptionA note for whoever picks the shift.
ActivityWhat the time counts as and how it pays. Only scheduled (rostered) activities are listed. A shift needs one before it can be imported.
BranchWhere the work happens. The branch's timezone sets the clock times, and auto-schedule counts coverage by branch.
Cost CentreWhere the hours are charged in payroll costing.
Holiday TypePays the activity's rate for Rest Day, Holiday, Double Holiday, Rest Day & Holiday, Special Holiday, Rest Day & Special Holiday or Double Holiday & Rest Day. Leave it empty for ordinary shifts: public holidays are tagged when the day is scheduled.
Access Group, Access Department, Access PositionNarrow who the shift is offered to. See below.
Is full dayNo times: the whole day shows as the activity, such as a rest day. Hides every time and option field.
Start Time, End TimeThe scheduled day. An end time earlier than the start means the shift ends the next day, shown as "(next day)".
Break-in, Break-outWhen the scheduled break starts and ends. Fill both or neither. Scheduled hours exclude the break.
Core start first, Core start lastA flexible start. Fill both or neither.
Absence ThresholdLate or early by more than this charges the whole day. Up to 16 hours.
Half Day ThresholdLate or early by more than this charges at least half the day. Up to 16 hours.
Overtime windowThe latest time overtime is counted to without a request. Greyed out when the activity does not allow an overtime window.

How a flexible start works

Core start first must be at or before Start Time, and Core start last at or after it. Anyone checking in inside that window is not late, and their day moves with them: they are expected to stay for the shift's full length from when they checked in.

For an 08:00 to 17:00 shift with core start 07:00 to 09:00:

  • Check in at 08:40: not late, expected out at 17:40.
  • Check in at 09:10: 10 minutes late, counted from 09:00, so expected out at 18:00.
  • Check in at 06:45: counted from 07:00, so expected out at 16:00.

How the thresholds charge a short day

KAMI adds up the person's lateness, early leaving and, if they must record breaks, any break overrun. Once they have checked out, it compares that total with the thresholds:

Over this thresholdWhat is charged
Half Day ThresholdAt least half the scheduled hours, as tardy
Absence ThresholdAll the scheduled hours, as tardy

Three things surprise people:

  • The day's status is not set to Absent. They checked in and out, so the status stays valid, but they lose the hours. Absent comes from missing or out-of-order check-ins.
  • Grace periods do not shrink the total compared. The thresholds look at the real minutes late or early, before any tardy grace or rounding.
  • Nothing applies until check-out. A person who is late but still at work is not charged yet.

People who do not have to check in, or on an activity that does not need check-in, are never tardy, so the thresholds do nothing for them.

How the overtime window works

The window opens when the scheduled day ends, or at the moved end for a flexible start. Time worked from then until the earlier of Overtime window and check-out counts as overtime, with no request. It needs both a check-in and a check-out.

The activity decides how that overtime is paid and can round it. In Attendance Rules, a company-wide overtime window minimum and forced break can reduce it. Time after the window's end is not counted by the window.

Who is offered the shift

When you pick a shift for one employee on the calendar, Select Shift shows "Showing shifts offered for" them. It lists shifts at the employee's branch, plus shifts whose Access Group, Access Department or Access Position includes them. One match is enough.

A shift with no branch and no access fields does not appear in that list. It still appears wherever no one employee is chosen: event templates, standard schedules and Bulk Event.

⚠️ The summary on the shift page says a shift with no access is "Offered for everyone", and joins the boxes with "and". When picking for one employee, the rule above is what applies.

What is not on a shift

SettingWhere it lives
Tardy grace and tardy roundingThe activity and the employee's attendance settings
Night differential window and rateThe activity
Whether breaks must be recorded (Break-in Required)The employee's attendance settings
Whether the break must be taken at the set times (Fixed Break Time)The employee's attendance settings
Excess and under-time weekly hoursAttendance Rules

What Happens Next

  • Choosing a shift copies its details into the event, template or schedule. You can still change anything before saving.
  • Editing or deleting a shift later changes nothing already scheduled from it.
  • Scheduled days become events, attendance is measured against them, and hours flow to the timesheet and payroll.

Tips

  • Treat a threshold change as a payroll change. Check the next timesheet after changing one.
  • Tell people the overtime window. Most overtime disputes are someone working past it in good faith.
  • One shift per real pattern. Near-duplicates fifteen minutes apart are how a team sits on the wrong one for months.
  • Give every shift a branch or access. Otherwise it cannot be picked for a single employee on the calendar.
  • Name shifts the way your import file will. The Bulk Schedule import needs the exact name.

Troubleshooting / FAQ

Q: How do I add a new working time or schedule? For one day, add a shift as above. For a repeating week, put shifts into an event template.

Q: Someone worked and lost the whole day's hours. Their lateness plus early leaving passed the Absence Threshold. Change it for future days if it is too tight.

Q: I can't set an Overtime window. The activity does not allow one. Change the activity, or the activity's setting.

Q: My shift is missing from Select Shift on the calendar. It has no branch matching the employee and no access field that includes them.

Q: I changed a shift and nothing moved. Expected. Change the existing events directly, or reapply the template or schedule.

Related articles